The project involves detailed structural, geotechnical and alignment designs within the scope of the construction of 49 km of 2 x 2 lane road including underpasses and overpasses.
  • Location Tokat / TURKEY
  • Client Republic of Turkey General Directorate of Highways (KGM)
  • Total Length of the Line 49 km, 2 x 2 Lane
  • Length of the Tunnel 1,4 km - Cut & Cover
  • Excavation 6.150.000 m³
  • Fill10.700.000 m³
  • Subbase 496.335 tons
  • Base Course643.529 tons
  • Bituminous Base Course 302.328 tons
  • Binder 242.862 tons
  • Wearing Course 153.038 tons
  • Concrete 301.850 m³
  • Regulating Works 49 km