Within the scope of the project; architectural, geotechnical, structural and landscaping design of two stations are carried out.
  • Location Ankara-Sivas / TURKEY
  • Client Turkish State Railways (TCDD)
  • Total Length of the High Speed Railway Line 2x152 = 304 km 
  • Total Length of the Conventional Line2x9,5 = 19 km 
  • No. of Stations 2 (Kırıkkale and Elmadağ)
  • Operations Control Center Ankara Operations Control Center
  • Train Speed 300 km/h
  • Subballast Supply & Laying 585.557 m3
  • Ballast Supply & Laying 770.860 m3  
  • Track Work with Ballast (Single Line) 275.262 line-m
  • Track Work without Ballast 56.116 line-m