The project involves geotechnical design services, determination design criteria, preparation of design and planning handbooks including detailed design using BIM method. The construction of two metro lines including the supply and installation of electromechanical systems and commissioning works. The line between Sancaktepe and Sultanbeyli will be 10,9 km and include 8 stations.
  • Location İstanbul / TURKEY
  • Client İstanbul Metropolitan Municipality, Directorate of Rail Systems, Department of Transportation